Logo
AGGO Pro engineer inspecting steel stairway on Evergreen Ave., Chicago

Steel Stairway Structural Integrity Assessment on Evergreen Ave., Chicago

Evergreen Ave., Chicago
Feb 2022 - Feb 2022
Commercial
Structural Inspections

Structural Inspection of Steel Stairway on Evergreen Ave., Chicago

Project Overview

AGGO Pro Construction & Engineering, a leader in Chicago's construction and engineering sector, was tasked with conducting a comprehensive structural inspection of an existing steel stairway located on Evergreen Ave., Chicago. This project underscored our expertise in structural engineering and our commitment to ensuring the safety and longevity of construction projects in the Chicago area. The inspection focused on assessing the stairway's load capacity, material condition, and compliance with local safety and building codes, ensuring its stability and performance for years to come.

  • Location:Evergreen Ave., Chicago
  • Duration:February 7, 2022 - February 14, 2022
  • Project Type/Category:Structural Inspections
  • Industry-Specific Details:Steel stairway structural integrity assessment
  • Scale/Scope Indicators:Single-site inspection with comprehensive reporting

AGGO Pro's team, led by structural engineer Linda Agojci, brought decades of combined experience to this project, ensuring that every aspect of the stairway's condition was meticulously evaluated. Our approach combined advanced diagnostic tools with hands-on inspection techniques, providing a thorough assessment that addressed both immediate concerns and long-term performance criteria.

Project Scope

The scope of this project encompassed a detailed evaluation of the steel stairway's structural integrity, focusing on key areas such as weld integrity, corrosion levels, and load-bearing capacity. Our objective was to identify any potential safety hazards and recommend corrective actions to ensure compliance with the City of Chicago's stringent building codes and OSHA safety standards.

Key Project Elements:

  • Load Capacity Assessment:Determined the stairway's ability to support expected loads, including dynamic and static forces.
  • Material Condition Evaluation:Identified signs of wear, corrosion, or damage that could compromise structural integrity.
  • Safety and Code Compliance:Verified adherence to local building codes and OSHA construction safety checklist requirements.
  • Recommendations for Repairs/Improvements:Provided actionable insights to enhance safety and durability.

Project Requirements & Challenges

Industry-Specific Requirements

In Chicago, building inspections must adhere to rigorous standards set by the City of Chicago Building Department. Our inspection process was designed to meet these requirements, focusing on critical areas such as structural stability, material durability, and safety compliance. The project also required a detailed understanding of local climate impacts on steel structures, given Chicago's variable weather conditions.

Challenges

One of the primary challenges was accessing hard-to-reach areas of the stairway for a thorough inspection. Additionally, interpreting the extent of corrosion and its impact on the stairway's load-bearing capacity required specialized expertise and equipment.

Implementation Complexities

Coordinating the inspection without disrupting the building's daily operations posed logistical challenges. Our team implemented a phased inspection approach, minimizing inconvenience while ensuring comprehensive coverage.

Solutions & Innovations

Solutions

AGGO Pro utilized non-destructive testing (NDT) techniques to assess the stairway's condition without causing damage. This approach allowed for accurate identification of internal and external defects, ensuring a thorough evaluation.

Quality Assurance

Our quality assurance process included cross-verification of findings by multiple team members, ensuring reliability and accuracy in our assessment. We also leveraged digital reporting tools to provide clear, actionable recommendations.

Performance Optimization

By identifying minor issues before they escalated, we helped the client avoid costly future repairs, optimizing the stairway's performance and safety.

Outcomes & Impact

Project Results

The inspection revealed areas requiring immediate attention, including weld repairs and corrosion treatment. Our recommendations were fully implemented, resulting in a 100% compliance rate with Chicago building codes.

Client Benefits

The client benefited from enhanced safety, reduced risk of structural failure, and peace of mind knowing their facility met all regulatory requirements.

Industry Impact

This project serves as a benchmark for structural inspections in Chicago, demonstrating the importance of regular assessments in maintaining public safety and structural integrity.

AGGO Pro Construction & Engineering continues to lead in providing innovative, cost-effective solutions for Chicago's construction and engineering needs. Our commitment to quality, safety, and client satisfaction drives our success in projects like the Evergreen Ave. steel stairway inspection.

Project Gallery

Similar Projects

Structural Capacity Analysis for New Fish Tank Installation in Chicago

...

Location: Aldine Ave., Chicago

Customer: Commercial

Date: Feb 2025 - Mar 2025

AGGO Pro team conducting structural inspection for fish tank installation in Chicago

Comprehensive Balcony Safety Inspection in Elk Grove Village

...

Location: Perrie Dr., Elk Grove Village, IL

Customer: Residential Property Management

Date: Jan 2025 - Jan 2025

Structural engineer inspecting balcony in Elk Grove Village

Structural Inspection and Condition Assessment of Balconies in Oak Park

...

Location: Susan Collins Ln., Oak Park

Customer: Residential

Date: Oct 2024 - Oct 2024

Structural inspection of balconies in Oak Park by AggoPro Construction and Engineering