Steel Staircase Reconstruction in Dayton St., Chicago
Steel Staircase Reconstruction in Dayton St., Chicago
Project Overview
AGGO Pro Construction & Engineering recently completed a comprehensive steel staircase reconstruction project in Dayton St., Chicago. This project involved the removal of an existing steel staircase, installation of new support posts, and the construction of new stair framing. The existing landing plate and stair treads were reinstalled onto the new structure, with one damaged tread replaced. The entire staircase was then treated for rust and old paint removal, followed by the application of a fresh coat of protective paint to enhance durability and corrosion resistance.
- Location:Dayton St., Chicago
- Duration:May 2021
- Project Type:Staircases
- Industry:Construction
This project showcases AGGO Pro's expertise in structural engineering and construction, particularly in metalwork and staircase fabrication. The team's ability to deliver a durable and aesthetically pleasing solution underlines their commitment to quality and client satisfaction.
Project Scope
The scope of this project encompassed the complete reconstruction of a steel staircase, ensuring structural integrity and longevity. Key objectives included the safe removal of the existing structure, precise installation of new support posts, and the meticulous reconstruction of stair framing. The project also focused on preserving as much of the original material as possible, with only necessary replacements to ensure safety and durability.
Key Project Elements:
- Removal of Existing Steel Staircase:Careful dismantling to preserve reusable components.
- Installation of New Support Posts:Ensuring structural stability for the new staircase.
- Construction of New Stair Framing:Precision engineering to match original specifications.
- Reinstallation of Landing Plate and Stair Treads:Maximizing the use of existing materials.
- Replacement of Damaged Tread:Ensuring uniformity and safety.
- Surface Treatment and Painting:Enhancing durability and resistance to environmental factors.
Project Requirements & Challenges
Industry-Specific Requirements
The project adhered to strict construction and safety standards, particularly those relevant to steel staircase fabrication and installation. Compliance with local building codes and regulations was paramount, ensuring the staircase's safety and functionality for years to come.
Challenges
One of the main challenges was the precise removal of the existing staircase without damaging reusable components. Additionally, the installation of new support posts required exact measurements to ensure the new structure's alignment and stability.
Implementation Complexities
The logistical complexities included coordinating the removal and installation processes within a tight timeline, ensuring minimal disruption to the surrounding area. The team also had to work around existing structures, requiring careful planning and execution.
Solutions & Innovations
AGGO Pro employed innovative techniques to address the project's challenges. Advanced measurement tools ensured the accurate placement of new support posts, while custom fabrication techniques allowed for the seamless integration of new and existing components.
Solutions
The team utilized laser measurement tools for precision and employed custom welding techniques to ensure the new structure's integrity. The use of high-quality protective paint also guaranteed the staircase's longevity.
Quality Assurance
Rigorous testing and inspection protocols were implemented at every stage of the project, from the initial removal to the final painting, ensuring the highest standards of quality and safety.
Performance Optimization
The project's success was measured by the staircase's structural integrity, aesthetic appeal, and the client's satisfaction. The use of durable materials and protective coatings ensures the staircase will withstand the test of time.
Outcomes & Impact
Project Results
The project was completed on time and within budget, with the new staircase exceeding safety and durability expectations. The client reported high satisfaction with the project's outcome, particularly the staircase's improved appearance and functionality.
Client Benefits
The client benefited from a structurally sound and aesthetically pleasing staircase, with the added assurance of its long-term durability and minimal maintenance requirements.
Industry Impact
This project reinforces AGGO Pro's reputation as a leader in steel staircase fabrication and construction, showcasing their ability to deliver complex projects with precision and excellence.
For more information on our services or to discuss your next project, contact AGGO Pro Construction & Engineering today.
Project Gallery
Similar Projects
Structural Integrity Restoration for Noble St. Metal Staircase
Location: Noble St., Chicago
Customer: Commercial
Date: Sep 2024 - Sep 2024

Comprehensive Staircase Restoration on Washtenaw Ave., Chicago
Location: Washtenaw Ave., Chicago
Customer: Residential
Date: Aug 2024 - Sep 2024