
Structural Beam Replacement at Pearl St., Franklin Park
Structural Beam Replacement at Pearl St., Franklin Park
Project Overview
AggoPro Construction & Engineering recently completed a critical structural beam replacement project at a residential property on Pearl St., Franklin Park. This project involved the removal of an existing timber beam and the installation of a new 20-foot steel beam, significantly enhancing the property's load capacity and structural stability. Our team's expertise in structural engineering and construction management ensured the project was completed efficiently, with minimal disruption to the property owners.
- Location:Pearl St., Franklin Park, IL
- Duration:May 13, 2024 - May 27, 2024
- Project Type:Structural Design
- Industry:Construction
AggoPro's role was pivotal in assessing the existing structural integrity, designing a cost-effective solution, and executing the beam replacement with precision. The project not only addressed immediate structural concerns but also ensured long-term performance and compliance with local building codes.
Project Scope
The project's primary objective was to replace a deteriorating timber beam with a robust steel beam to support the residential structure adequately. The scope included a thorough structural assessment, precise beam fabrication, and seamless installation to avoid any structural compromises during the transition.
Key Project Elements:
- Structural Assessment:Conducted a detailed evaluation of the existing beam and surrounding structure to identify potential risks and requirements.
- Beam Fabrication:Custom-designed a 20-foot steel beam to meet specific load-bearing needs and local building code requirements.
- Installation:Executed the removal of the timber beam and installation of the steel beam with minimal disruption to the property.
- Compliance Verification:Ensured all work adhered to Franklin Park building codes and safety standards.
Project Requirements & Challenges
Industry-Specific Requirements
The project demanded strict adherence to structural engineering principles and local building codes. The new steel beam needed to meet specific load capacity requirements to ensure the safety and longevity of the residential structure. Additionally, the project timeline was tight, requiring efficient coordination and execution.
Challenges
One of the main challenges was the precise removal of the existing timber beam without causing damage to the surrounding structure. The installation of the new steel beam required careful planning to ensure it fit perfectly and provided the necessary support.
Implementation Complexities
The logistical complexities included coordinating the delivery of the custom-fabricated steel beam and managing the installation process within the confined space of the residential property. Weather conditions also posed a potential risk to the project timeline.
Solutions & Innovations
Solutions
AggoPro's team utilized advanced structural engineering techniques to design a steel beam that not only met but exceeded the required load capacity. The installation process was meticulously planned to ensure minimal disruption and maximum efficiency.
Quality Assurance
Quality control measures included rigorous testing of the steel beam before installation and continuous monitoring during the installation process to ensure all specifications were met.
Performance Optimization
The project team optimized performance by selecting high-quality materials and employing skilled labor to ensure the beam's installation was flawless and durable.
Outcomes & Impact
Project Results
The project was completed on time and within budget, with the new steel beam successfully installed and verified for compliance with all building codes. The structural integrity of the property was significantly enhanced, ensuring long-term safety and stability.
Client Benefits
The property owners benefited from a structurally sound home, with the assurance that the new beam would provide reliable support for decades. The project also minimized disruption, allowing the residents to continue their daily lives with little inconvenience.
Industry Impact
This project exemplifies AggoPro's ability to deliver high-quality structural solutions in residential settings, reinforcing our reputation as a trusted provider of construction and engineering services in the Chicago area.
Project Gallery
Similar Projects
Steel Frame Structural Design in Elm Ave., Mundelein
Location: Elm Ave., Mundelein, USA_Chicago
Customer: Residential
Date: Feb 2025 - May 2025

Residential Steel Beam Installation in Glenview
Location: Greenwood Rd., Glenview, IL
Customer: Residential
Date: Feb 2025 - Mar 2025
